Manufacturing footage · TEPCO Group plantsPower distribution, built in the Kingdom.
Low and medium voltage switchgear under Schneider Electric licence — engineered, assembled and routine-tested on our own floor in Madinah.
Three ranges, one floor.
Assemblies for utilities, industry and the built environment — configured to your single-line diagram, not to a catalog.
All product ranges
LV switchboards
EPOS and PrismaSeT main and sub-main boards, and distribution boards — EPOS up to 5,000 A, designed to IEC 61439.
Explore
MV switchboards
PIX Easy primary switchgear at 17.5 kV, package substations, GIS ring main units and MV capacitor banks.
Explore
Smart grid infrastructure
Monitoring, protection and automation built into the assembly, so the network can be seen and operated remotely.
ExploreSheet to switchboard, inside one gate.
Cutting, folding, welding and coating sit on the same site as assembly and test. Nothing critical leaves the plant between the drawing and the finished board.
That is what shortens a change: an engineer walks to the machine.
- 36,000 m² at Industrial City (MODON) Phase 4, Madinah
- CNC punching, bending and welding for enclosures and busbar
- Powder coating line, commissioning through 2026
- Routine testing to IEC 61439 before anything ships

Five business units. One record.
Each unit carries its own head, its own budget and its own identity — and the same registration, licences and quality system behind it.
The unit identity systemThe installed base, kept running.
Maintenance, retrofit and modernization for switchgear already in service — ours and other manufacturers'.
Services and engineering
On site, on the asset
Preventive maintenance, thermographic survey, fault attendance and commissioning support across the Kingdom.
Explore
Older switchgear, current protection
Retrofit of protection, monitoring and breakers — capacity and safety raised without replacing the room.
ExploreDocuments and certificates.
What a procurement team screens on first. Issued against a named enquiry.
The full registerWhat the work actually looks like.
Madinah, and the Group plants behind it. The laser cutting and coating images are from TEPCO Group plants; the Madinah coating line commissions through 2026.
Inside the plant



Three ways to start. All of them reach an engineer.
Enquiries are answered by the engineer who would run the job — not a form queue.
Send a question, a photo of a rating plate or a drawing reference. Business hours, Sunday to Thursday.
Open WhatsAppBook a 20-minute call
Pick a slot with a sales engineer — specification review, qualification or a project walk-through.
See available timesSend your single-line diagram
Ratings, forms of separation and site conditions in, a technical proposal back.
Request a proposal