Documents and certificatesPrequalificationCareersMadinah, KSA920018640info@tepco-ksa.comالعربية
ProductsServicesManufacturingIndustriesProjectsAboutBusiness unitsLicences and certificatesContact
Talk to an engineerالعربية
Medium voltage panels standing indoors at a TEPCO Group plant
Industries

General compliance is the baseline. The sector decides the layer on top.

IEC and Saudi grid compliance is table stakes on every product we build. What changes by sector is what sits above it: the hazardous-area rating, the Form 4 separation, the redundancy.

Sectors served

Six sectors, and what each one adds.

The layer above the baseline, sector by sector.

Package substation enclosures outdoors
Energy

Oil, gas and petrochemical

For the corrosion, ambient temperature and hazardous-area constraints of refineries, gas plants and pipeline pumping stations.

  • IEC 62271 · SAES · SAMSS
Line of medium voltage panels with test gear
Utilities

Energy and utilities

Specified for Saudi Electricity Company distribution and transmission: primary 24 kV substations, smart RMUs and package substations.

  • IEC 62271 · SEC specifications · IEC 61850
Long line of LV cubicles under assembly
Industrial

Industrial and manufacturing

LV and MV distribution for plants, cement works, water treatment and pumping stations, integrating with motor control centers and drives.

  • IEC 61439 · IEC 62271 · MCC-compatible
Engineers checking a control panel with indicator lamps
Critical load

Healthcare and education

Critical-load infrastructure for hospitals, clinical facilities and universities, with life-safety load segregation.

  • IEC 61439 · Form 4 · ATS integration
Installed panel front with meters at a transport facility
Infrastructure

Buildings and infrastructure

Main distribution for commercial developments, data centers, transport facilities and the Vision 2030 megaproject program.

  • Up to 5,000 A · IEC 61439 · IP 54
Close view of a solar array
Renewables

Renewable generation

Collection, distribution and grid-connection equipment for solar plants, supported by group experience in grid-connected generation.

  • MV collection · Grid connection · Monitoring
Sector requirements

Tell us the specification, not the sector.

Sector labels are a useful shorthand, but they do not price a board. The requirements that change a design are specific.

Send those and our engineers respond against them directly. If a specification clause is one we cannot meet, we identify it in the proposal rather than leave it to be discovered at the factory acceptance test.

  • The applicable specification and its revision
  • Form of separation, short-circuit withstand and duration
  • Ambient and altitude derating, ingress and corrosion class
  • Arc-fault requirement and the automation protocol the asset must speak
Test equipment set up beside a switchboard before dispatch
Next step

Send us the drawing. We will send back a proposal.

Give our Madinah engineering team a single-line diagram, a board schedule or a scope of work, and you get a technical proposal — not a brochure.

WhatsAppBook a call