What it does for your bid
Government and semi-government procurement in the Kingdom scores the local content of what you buy. Equipment manufactured in the Kingdom carries that weighting into your evaluation; equipment imported complete does not.

The instrument, the issuing authority, the reference number and the validity date — statutory, product, management-system and local content, in one register. Certified copies are issued on request to anyone building a qualification file on us.
The General Distinguished Company for Technical Projects TEPCO, registered in Al Madinah Al Munawarah and manufacturing under Saudi industrial and environmental licence.
The design standards, the BlokSeT licence and where it stands, and the management systems behind the work.
| Standard or licence | Applies to, and status |
|---|---|
| Schneider Electric licence — PrismaSeT | Low voltage wall-mounted and floor-standing switchboards. Held. |
| Schneider Electric licence — PIX Easy | Medium voltage primary air-insulated switchgear at 17.5 kV. The licence is signed; the licence certificate is in process. Signed — certificate in process |
| Schneider Electric licence — BlokSeT | Low voltage switchboards to 6,300 A. Under application — not yet issued. |
| IEC 61439-1 / -2 | Low voltage assemblies. Designed to the standard; compliance documentation issued on request. |
| IEC 62271 series | MV switchgear, ring main units and package substations. Designed to the applicable parts of the series. |
| IEC 61850 | Substation automation and smart-grid equipment. Supported; commissioning and migration performed in-house. |
| ISO 9001:2015 | Quality management. Certificate issued on request. |
| ISO 14001:2015 | Environmental management. Certificate issued on request. |
| ISO 45001:2018 | Occupational health and safety. Certificate issued on request. |
Local content is scored on your tender, not in our brochure. This is where our Saudi content comes from, and how the certificate and the score reach your file.
Government and semi-government procurement in the Kingdom scores the local content of what you buy. Equipment manufactured in the Kingdom carries that weighting into your evaluation; equipment imported complete does not.
Engineering, assembly, testing and stores sit on one 36,000 m² site in Madinah under Saudi industrial licence. Fabrication and coating are being brought in-house through 2026, so the metal inside a Saudi-assembled board is Saudi-made too.
The Saudi Made mark is held today. Our local content certificate is under application with the Local Content and Government Procurement Authority and is expected shortly — the content it measures is already in place. Once issued, the certificate and its score go to you against a named tender; no percentage is published on this site.
Saudi Made. The company is a member of the Saudi Made program, and the mark is carried on the products registered and approved under it. It is placed here as the program supplies it, unaltered.
Certification moves with the line. What is in progress is listed so a vendor file can be built on current information — ask where any of it stands and you get a date, not an assurance.
| Record | Status |
|---|---|
| Saudi Made program | Member. The company and its registered products are approved to carry the Saudi Made mark under the program’s rules. |
| Jadeer qualification certificate | Qualified by Monsha’at on 19 January 2026, certificate 8298247328. Its validity tracks the earliest expiry among the supporting documents, so the current certificate is issued on request. |
| Enterprise size certificate | Current. Issued by Monsha'at; copy issued on request. |
| Local content data file | Application in process. Filed with the Local Content and Government Procurement Authority; the certificate is expected shortly. |
| Saudi workforce | Saudi nationals recruited across engineering, manufacturing, commercial and corporate functions, with graduate and internship programs of three to six months, aligned with HRDF. |
| Schneider Electric fabrication audit | In progress. The audit qualifying our fabrication line for licensed enclosure work is scheduled as the line is commissioned. |
| Local content certificate | Under review by the Local Content and Government Procurement Authority. The certificate and its score are issued against a named tender once granted. |
| ISO scope extension to fabrication and coating | In progress, alongside the fabrication line. |
Send the questionnaire and it comes back completed, with certified copies of every record above and a named contact for verification.
Licences, certificates and compliance documentation, issued against a named enquiry.
Send a prequalification requestAsk whether a specific standard or licence covers your scope before you raise the questionnaire.
Message us on WhatsAppTwenty minutes with the person who holds the register, for auditors and vendor-management teams.
Book a call