Workers and finished enclosures on the shop floor inside the Madinah plant
Manufacturing · Al Madinah Al Munawarah

36,000 m² in Madinah, and everything that matters is inside it.

Design offices, fabrication, assembly bays, test area and stores on one site — which is why our engineers can walk to the board they specified.

36,000 m²
Site area
MODON Phase 4
Industrial City, Madinah
423223729
Industrial licence
131030083002-01
Investment licence
The floor

Five zones, in the order the work flows.

Drawing to dispatch, inside one gate.

01

Engineering and technical office

Design, drafting, estimating and the technical submittal work that decides whether a design is approved first time.

Fabrication bay with benches and machines
02

Fabrication

Cutting, punching, forming, busbar processing and the pretreatment and coating line — commissioned in phases through 2026.

Row of low voltage boards under build
03

Assembly bays

Low voltage switchboard assembly with kitting staged against the works order. The bays are laid out for BlokSeT, whose Schneider Electric licence is under application.

Test equipment set up beside a switchboard
04

Test and FAT

Routine testing and customer factory acceptance testing, witnessed on site in Madinah rather than in another country.

Worker at a bench with store racks behind
05

Stores and dispatch

Controlled stores with coded locations and recorded material movements against each works order.

Across all five zones

One works-order system, and one record behind it.

Every job carries a works order that records materials, recorded labour hours, quality checks and non-conformances.

It is the same record the invoice and the cost report are built from — which is why a question about your job has one answer, not three.

  • Materials issued against the order, from coded store locations
  • Recorded labour hours, not estimates
  • Quality checks and non-conformances on the order
  • Test records filed against the same number
Three engineers reviewing job documents on the floor
Quality review — TEPCO Group manufacturing.
Inside the hall

What the floor actually looks like.

Madinah, this year.

Panels standing in the hangar with the blue floor stripe
Long line of open LV cubicles receding down the hall
Busbar and barrier sets staged in the hall
Wide view of the shop floor with machines and panels
Line of enclosure frames awaiting assembly
The floor

Built in stages, with the services in place first.

Each stage runs only once the electrical, extraction and environmental works it depends on are complete.

Phase work

Fabrication equipment

Cutting, punching, forming and busbar processing, landing in phases through 2026.

Phase work

Testing laboratory

Test capability on site, so routine and acceptance testing happen where the board was built.

First

Electrical, extraction and environmental works

The utilities those machines depend on are built before the machines arrive, not after.

Visiting

Factory acceptance testing is a reason to come to Madinah.

Customers, consultants and their clients are welcome on site for factory acceptance testing, pre-inspection and audit. FAT is scheduled against the works order and confirmed in writing, with the test schedule issued in advance.

Sales offices in Riyadh, Jeddah and Dammam handle commercial coordination. The equipment, the test bay and the engineers who built the board are in Madinah.

Customer witness test around a finished switchboard
FAT in Madinah
Witnessed on our floor
Next step

Send us the drawing. We will send back a proposal.

Give our Madinah engineering team a single-line diagram, a board schedule or a scope of work, and you get a technical proposal — not a brochure.