Documents and certificatesPrequalificationCareersMadinah, KSA920018640info@tepco-ksa.comالعربية
ProductsServicesManufacturingIndustriesProjectsAboutBusiness unitsLicences and certificatesContact
Talk to an engineerالعربية
Panels standing in the Madinah hangar along the blue floor stripe
Business units

Five units. One record.

Each unit carries its own head, its own budget and its own identity — and the same registration, licences and quality system behind it.

5
Business units
3
Operating today
Madinah
One plant behind all five
The five

One circle, five drawings.

Each unit is a working line with its own head and its own budget, not a label on an organization chart. Three are operating today; two commission through 2027.

The company behind them
LV Assembly · Operating

Form-segregated boards, built to a standard design.

BlokSeT under a Schneider Electric manufacturing licence now under application, the EPOS range of our own design, and PrismaSeT International. It is the largest unit by volume and the one that anchors the Madinah floor.

  • Main and sub-main distribution boards up to 6,300 A
  • Forms of internal separation up to Form 4
  • Designed to IEC 61439-1 and -2
  • Routine-tested in Madinah before despatch
A row of low voltage boards under build on the Madinah floor
The Board
The drawing in the circle
MV Assembly · Operating

Metal-clad cells, arc-classified, licence-built.

Metal-clad, arc-classified cells to IEC 62271, built under licence and configured to the single-line diagram, with compliance evidence issued per enquiry.

  • Metal-clad cells, ring main units and package substations
  • Up to 36 kV
  • Built to the applicable parts of the IEC 62271 series
  • Configured to your single-line diagram
A line of medium voltage panels with test gear alongside
The Contacts
The drawing in the circle
Medium voltage assembly at a TEPCO Group plant in Egypt.
Fabrication · Starts 2027

Cut, fold, weld, coat — to the drawing.

Sheet metal, busbar and copper, job-shop parts and powder coating. Equipment is landing through 2026, supplying our own assembly first and opening to external customers as each stage is commissioned.

  • Sheet metal — cutting, punching and folding
  • Busbar and copper preparation
  • Powder coating, pretreatment to topcoat
  • Job-shop parts for third parties as each stage is commissioned
The fabrication bay in Madinah, with benches and machines
The Plate
The drawing in the circle
Services & Engineering · Operating

The installed base, kept alive and brought forward.

Design and specification support, project management, commissioning, maintenance contracts, retrofit and modernization. It works across the installed base — ours and other manufacturers'.

  • Commissioning and site testing
  • Maintenance contracts and planned shutdown work
  • Retrofit and modernization of installed boards
  • Works on other manufacturers’ equipment as well as our own
A TEPCO field team at a customer transfer switch panel
The Reading
The drawing in the circle
Trading · Starts 2027

The right part, sourced and landed.

A supply line for components and third-party equipment, starting in 2027. It will sit alongside our own manufacture rather than replace it.

  • Components and spares for installed equipment
  • Third-party equipment alongside our own manufacture
  • Sourced against a named project rather than stocked blind
Components kitted on benches ready for assembly
The Cycle
The drawing in the circle
Capability

What to ask each unit for.

One enquiry reaches the unit that owns the work. The registration, the licences and the quality system behind all five are the same.

UnitAsk it forStatus
LV AssemblyMain and sub-main low voltage boards, forms of separation to Form 4, up to 6,300 AOperating
MV AssemblyMetal-clad cells and ring main units to 17.5 kV, package substations to 36 kV, capacitor banks to 36 kVOperating
Services and EngineeringSpecification support, commissioning and site testing, maintenance contracts, retrofit and modernizationOperating
FabricationEnclosures, busbar and copper, job-shop parts and powder coatingStarts 2027
TradingComponents, spares and third-party equipment against a named projectStarts 2027
Equipment ratings are the values on the rated-values tables of the product pages, not a sales figure. Compliance documentation is issued against a named enquiry.
WhatsAppBook a call