Chemicals and effluent, under permit
Pretreatment and powder coating run under the plant's environmental permit, which covers coating chemicals and pretreatment effluent. Pretreatment chemistry, film thickness and adhesion are recorded per batch.

Our environmental position is what the permit says and what the records show: a current permit for the Madinah plant, controlled coating chemistry and effluent, and the environmental works completed before the machines run.
All three are in the documentation register with their issuing authority and validity date, and certified copies are issued on request.
The coating line is the plant's main environmental exposure, so it is the most controlled process on the floor.
Pretreatment and powder coating run under the plant's environmental permit, which covers coating chemicals and pretreatment effluent. Pretreatment chemistry, film thickness and adhesion are recorded per batch.
The electrical, extraction and environmental works the new machines depend on are completed before those machines are commissioned. A stage does not run until its services are in place.
Environmental management sits under our management-system certification, and extension of the scope to the new fabrication and coating work is in progress. The certificate is issued on request.
Sourced facts, with their provenance named. Where we hold no measured figure, this page gives none.
| Subject | What the record says |
|---|---|
| Saudi manufacturing base | A 36,000 m² plant at Industrial City (MODON) Phase 4, Al Madinah Al Munawarah. Equipment for Saudi projects is engineered, assembled and tested in the Kingdom rather than imported complete. |
| Renewable generation, group | TEPCO for Renewable Energy was established in the group in 2015 and commissioned a 1 MWp grid-connected rooftop solar plant delivering approximately 1,797 MWh a year. That is a group asset, not a Madinah installation. |
| Local content | Our local content certificate is under application with the Local Content and Government Procurement Authority; the Saudi Made mark is already held. The certificate and its score are issued against a named tender once it is granted. |
| Saudi workforce | Saudi nationals recruited across engineering, manufacturing, commercial and corporate functions, with graduate and internship programs of three to six months, aligned with HRDF programs. |
| Vision 2030 | Manufacturing in the Kingdom and measured local content are the contribution we claim. No emissions figure, intensity figure, target or percentage is published. |
Consultants and clients auditing environmental compliance can request the permit and the coating-line records against a named enquiry.