Oil, gas and petrochemical
Refineries, gas plants and pipeline pumping stations. Assemblies are configured to the Saudi Aramco SAES and SAMSS specifications written into these enquiries.

TEPCO equipment runs today in hospitals, utilities, industrial sites and institutions across the Kingdom. On these cards the client is identified by role, and the fuller record is released inside a qualification file.
Sectors first, because that is what a qualification file is sorted by. The delivered references are listed below, and they do not yet cover every sector here.
Sector requirementsRefineries, gas plants and pipeline pumping stations. Assemblies are configured to the Saudi Aramco SAES and SAMSS specifications written into these enquiries.
Saudi Electricity Company distribution and transmission: primary 24 kV substations, smart RMUs and package substations.
Production plants, cement works, water treatment and pumping stations, integrated with motor control centers.
Hospitals, clinical facilities and universities: Form 4 separation, automatic transfer and life-safety segregation.
Commercial developments, data centers, transport facilities and the Vision 2030 megaproject program.
Collection, distribution and grid-connection equipment for solar plants.
Each card carries the same record: client, scope, location, date, value and a brief. Where a field has not been released for publication it says so — we do not fill it with something plausible. The full register, with scope and dates, goes to a qualified party on request.
The largest single order in the company's record, and the project that set the pattern for the hospital work that followed: a complete distribution package for an acute-care facility where the critical circuits cannot be interrupted for maintenance. Switchgear and boards were engineered against the hospital's own single-line diagram, built and tested as one package, and delivered in phases to match the construction program.

A specialist treatment center alongside a general hospital, each with its own load profile and its own continuity requirement. The distribution had to serve both without one borrowing margin from the other. The package covered medium voltage distribution and the low voltage boards beneath it, engineered as one scheme and tested together before dispatch.

Retail distribution is a tenancy problem before it is an electrical one. Each unit needs metering, isolation and the ability to be worked on without taking the mall off supply. The board schedule was built around tenant changeover rather than around the connected load alone, with spare ways designed in from the start.

A military hospital carries a clinical continuity requirement and an institutional approval process at the same time. Drawings, materials and test records all pass through a review that a commercial project does not have. The work was engineered and tested in Madinah, a short distance from the site, which shortened every approval cycle on the job.

A campus is a small distribution network rather than a single building: a medium voltage spine feeding substations, each with its own low voltage board, all of it expected to grow. The MV and LV scopes were ordered separately and engineered as one network, so the second package landed inside the capacity the first had been built to carry.

A training complex is a cluster of similar buildings on one supply, which makes standardization worth more than bespoke design. The same board type, repeated, is easier to maintain and easier to hold spares for. A single standard design was approved once and built many times, with the schedule driven by the handover sequence of the buildings.

Supervision is what turns a distribution system into something an estates team can run. The requirement was visibility of every switchboard from one place, with alarms that reach an operator rather than a panel nobody watches. The scope covered the supervisory system over the hospital's electrical distribution, integrated with the existing boards rather than replacing them.

A water plant does not stop. The distribution is built as a ring so that a fault on one leg is isolated without dropping the pumps, and so that maintenance can be done on a section rather than on the plant. The scope was the 36 kV ring main switchboards themselves — the highest system voltage in this reference list, and the one that sets the insulation and clearance requirements for everything around it.

The largest low voltage package of the current order book, and a complete one: the main board, the power factor correction that keeps the tariff honest, and the sub-boards beneath them. Engineered, built and tested in Madinah for a site in the same city — the shortest supply chain a project of this size can have.

A nineteen-cell medium voltage lineup is a primary distribution asset in its own right, not an accessory to a building. The cell schedule — incomers, couplers, risers and feeders — is the design. Supplied as a single lineup at 13.8 kV, the system voltage used across much of the Kingdom's distribution network.

Defense work brings a documentation and vetting requirement that civil projects do not, and a reporting line that runs through the main contractor rather than to the end user. Scope and location are not published. The record is available against a named enquiry.

A production plant's distribution is judged on one thing: what a fault costs in lost output. That pushes the design toward selectivity and toward boards that can be worked on while the line runs. The scope covered the plant's low voltage distribution, with the board arrangement set by the production layout rather than by the building.

A hotel in Makkah has a load profile unlike any other building type in the Kingdom: near-empty for part of the year, at full occupancy and full mechanical load for the rest, with no tolerance for an outage during the season. The distribution was sized and arranged for that swing, and for maintenance windows that exist only outside it.

Airport distribution is governed by the things that may not fail — lighting, screening, baggage handling — and by a construction program that runs around an operating terminal. Boards were built and delivered to suit phased possession of the areas they served, which is the constraint that decides the schedule on live airport work.

Rehabilitation is harder than new build. The existing plant has to keep producing, the records of what was installed are rarely complete, and every tie-in is a planned outage someone has to justify. The work replaced and upgraded the mill's electrical distribution against a survey of what was actually there, not against the original drawings.

Nothing under that filter yet.
Four routes. What each one includes is stated on it, not implied.
Issued in a prequalification file or on direct request, under the client’s own name.
Sector, voltage, scope and year without the client name. These travel freely.
Submittal approvals are available on request within a qualification file, reviewed case by case.
Held at group level and issued through TEPCO Group and its subsidiaries — four decades of project history behind the Saudi file.
Site work across the Kingdom, from commissioning to handover.





Tell us the sector, the voltage level and the scope you are qualifying for, and we will send the closest references we can share.